ARTICLE | 5 MIN | VIEWS FROM THE FLOOR

The Copper Bottleneck: What’s the Impact on AI and Net Zero?

March 26, 2024

The critical role of copper in powering AI and enabling net-zero targets brings a looming supply issue into sharp focus.

Copper has been used by humans over for well over 10,000 years. More than ever this ancient metal is a key driver behind humanity’s technological progress, from AI to net zero.

However, demand for this often underappreciated metal is outstripping supply, driving up prices and potentially hampering the pace of development. Copper is at the heart of electricity and high conductivity and light weight make it an indispensable material in electric wiring and grids, accounting for approximately 90% of global copper usage.

AI and renewable energy have physical requirements and need infrastructure such as data centers to house and process the vast amount of data and wind turbines and electric vehicle (EV) batteries to meet sustainability targets. Electricity and copper are critical inputs into both these stories and will drive incremental structural demand in the coming years.

Figure 1: Heading for a significant copper shortage (Figures do not yet include AI effects)

Problems loading this infographic? - Please click here

Source: BloombergNEF

Data centers are a crucial component of the rapid diffusion of AI technologies and the power markets will see demand rocket as more data centers are built to support AI. A traditional rack in a data center typically needs between 10-15kW of power. Compare this to the 40-60kW of power needed for AI-ready racks with energy intensive GPUs (Graphics Processing Units) – this represents between 4-6x more power and cooling usage.1

For a sense of scale – in 2022, just in the US, data centers consumed 17GW of energy. It is estimated that by the end of the decade, data centers power needs will double to 35GW2. When viewing this growth, keep in mind :

  1. data center buildout estimates from AI penetration are early stage and likely underestimates ultimate demand. Blackstone’s COO John Gray on a recent earnings call said he expects that tech companies will invest $1 trillion over the next five years in AI and this is mostly directed towards data centers.3
  2. this incremental power demand will likely draw from clean energy technologies as much as traditional power sources. Even clean energy is a massive copper user.

What does this mean for copper demand?

While the physical market implications are still at an early stage for the global copper markets, the outlook provides strong secular tailwinds to demand. It is estimated that it takes close to 65,000 tonnes of copper per every GW of applied power.4 AI and data center usage for copper lies within two major areas:

  1. actual components into data center such as power distribution, grounding and interconnections and
  2. the generation of incremental electricity to power and cool the data center.

The actual copper usage will not be static as fibre is a more efficient form of connections but more processing intensity will demand more copper usage.

If we assume that between 3-5GW of data center applied power are built every year in the US (and the AI race is hardly US only) – the potential incremental copper demand just from the US data center buildout could range between 0.5-1.5% of global copper demand. Although this might seem insignificant, even a 1% shortage could plunge the market into a significant deficit.

Renewable energies fuel copper use

Looking beyond copper applications in data centers, the need for more power will also drive incremental generation from clean energy, potentially in the form of distributed grids (think solar panels and wind turbines). Consider that it takes between 4-5 tonnes of copper to build an onshore wind turbine or solar panel to generate 1-3MW of power.5

Add to that the increased roll-out of electric vehicle (EVs) batteries and the push for sustainability has an unintended consequence of eating up a finite resource. A traditional internal combustion engine vehicle uses a fraction of the copper contained in an EV – 48 pounds for a combustion engine vs 183 pounds for an electric vehicle battery. A hybrid car contains 88 pounds of copper.

As the world endeavours to achieve net-zero emissions over the next three decades, copper demand is anticipated to grow five to six-fold. However, this surge might be challenging to meet given current supply constraints.

Constraints in copper mining

Copper supply has been further strained by operational and political instability in regions where it is mined, including Congo, Kazakhstan, Mongolia, and Latin America. Over the past year, an estimated 3-5% of global supply has been disrupted due to these factors.

Moreover, copper's supply response is notoriously slow. A typical copper mine takes about 10-15 years to explore, develop and bring online. There are no quick fixes like shale wells in the oil industry, which can be operational in mere days.

As a result of these factors, the copper market is barrelling towards a significant deficit and a price surge over the next few decades that investors should not discount when looking at the potential for AI and renewable energy.

With contributions from Man GLG portfolio manager Albert Chu.

All sources Bloomberg unless otherwise stated.

1. www.datacenterdynamics.com/en/news/us-data-center-power-consumption/#:~:text=Data%20center%20power%20consumption%20in,almost%20double%20its%202022%20level.
2. www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/investing-in-the-rising-data-center-economy
3. Blackstone Q2 2023 earnings calls
4. www.insight.com/content/dam/insight/en_US/pdfs/apc/apc-estimating-data-centers-carbon-footprint.pdf
5. www.visualcapitalist.com/sp/copper-intensity-of-renewable-energy/

For further clarification on the terms which appear here, please visit our Glossary page.

This information is communicated and/or distributed by the relevant Man entity identified below (collectively the "Company") subject to the following conditions and restriction in their respective jurisdictions.

Opinions expressed are those of the author and may not be shared by all personnel of Man Group plc (‘Man’). These opinions are subject to change without notice, are for information purposes only and do not constitute an offer or invitation to make an investment in any financial instrument or in any product to which the Company and/or its affiliates provides investment advisory or any other financial services. Any organisations, financial instrument or products described in this material are mentioned for reference purposes only which should not be considered a recommendation for their purchase or sale. Neither the Company nor the authors shall be liable to any person for any action taken on the basis of the information provided. Some statements contained in this material concerning goals, strategies, outlook or other non-historical matters may be forward-looking statements and are based on current indicators and expectations. These forward-looking statements speak only as of the date on which they are made, and the Company undertakes no obligation to update or revise any forward-looking statements. These forward-looking statements are subject to risks and uncertainties that may cause actual results to differ materially from those contained in the statements. The Company and/or its affiliates may or may not have a position in any financial instrument mentioned and may or may not be actively trading in any such securities. Unless stated otherwise all information is provided by the Company. Past performance is not indicative of future results.

Unless stated otherwise this information is communicated by the relevant entity listed below.

Australia: To the extent this material is distributed in Australia it is communicated by Man Investments Australia Limited ABN 47 002 747 480 AFSL 240581, which is regulated by the Australian Securities & Investments Commission ('ASIC'). This information has been prepared without taking into account anyone’s objectives, financial situation or needs.

Austria/Germany/Liechtenstein: To the extent this material is distributed in Austria, Germany and/or Liechtenstein it is communicated by Man (Europe) AG, which is authorised and regulated by the Liechtenstein Financial Market Authority (FMA). Man (Europe) AG is registered in the Principality of Liechtenstein no. FL-0002.420.371-2. Man (Europe) AG is an associated participant in the investor compensation scheme, which is operated by the Deposit Guarantee and Investor Compensation Foundation PCC (FL-0002.039.614-1) and corresponds with EU law. Further information is available on the Foundation's website under www.eas-liechtenstein.li.

European Economic Area: Unless indicated otherwise this material is communicated in the European Economic Area by Man Asset Management (Ireland) Limited (‘MAMIL’) which is registered in Ireland under company number 250493 and has its registered office at 70 Sir John Rogerson's Quay, Grand Canal Dock, Dublin 2, Ireland. MAMIL is authorised and regulated by the Central Bank of Ireland under number C22513.

Hong Kong SAR: To the extent this material is distributed in Hong Kong SAR, this material is communicated by Man Investments (Hong Kong) Limited and has not been reviewed by the Securities and Futures Commission in Hong Kong.

Japan: To the extent this material is distributed in Japan it is communicated by Man Group Japan Limited, Financial Instruments Business Operator, Director of Kanto Local Finance Bureau (Financial instruments firms) No. 624 for the purpose of providing information on investment strategies, investment services, etc. provided by Man Group, and is not a disclosure document based on laws and regulations. This material can only be communicated only to professional investors (i.e. specific investors or institutional investors as defined under Financial Instruments Exchange Law) who may have sufficient knowledge and experience of related risks.

Switzerland: To the extent this material is made available in Switzerland the communicating entity is:

  • For Clients (as such term is defined in the Swiss Financial Services Act): Man Investments (CH) AG, Huobstrasse 3, 8808 Pfäffikon SZ, Switzerland. Man Investment (CH) AG is regulated by the Swiss Financial Market Supervisory Authority (‘FINMA’); and
  • For Financial Service Providers (as defined in Art. 3 d. of FINSA, which are not Clients): Man Investments AG, Huobstrasse 3, 8808 Pfäffikon SZ, Switzerland, which is regulated by FINMA.

United Kingdom: Unless indicated otherwise this material is communicated in the United Kingdom by Man Solutions Limited ('MSL') which is a private limited company registered in England and Wales under number 3385362. MSL is authorised and regulated by the UK Financial Conduct Authority (the 'FCA') under number 185637 and has its registered office at Riverbank House, 2 Swan Lane, London, EC4R 3AD, United Kingdom.

United States: To the extent this material is distributed in the United States, it is communicated and distributed by Man Investments, Inc. (‘Man Investments’). Man Investments is registered as a broker-dealer with the SEC and is a member of the Financial Industry Regulatory Authority (‘FINRA’). Man Investments is also a member of the Securities Investor Protection Corporation (‘SIPC’). Man Investments is a wholly owned subsidiary of Man Group plc. The registration and memberships described above in no way imply a certain level of skill or expertise or that the SEC, FINRA or the SIPC have endorsed Man Investments. Man Investments Inc, 1345 Avenue of the Americas, 21st Floor, New York, NY 10105.

This material is proprietary information and may not be reproduced or otherwise disseminated in whole or in part without prior written consent. Any data services and information available from public sources used in the creation of this material are believed to be reliable. However accuracy is not warranted or guaranteed. © Man 2025